Subject: переходящее строительство construct. помогите с сабжем, плиз.Как я понял, оно "переходит" из одного (финансового) года в другой или как-то так >_< |
|
link 22.10.2015 14:09 |
сама фраза: "На переходящее строительство не требуется ежегодно получать разрешение на производство работ" |
There is no need for the work permit renewal if the project construction is not completed during the year. |
construction projects carried over from previous years (?) |
TYPES OF PROJECTS Carry Over (CO) projects carried over from previous budget year. Construction (C) projects are projects in which the building, replacement or implementation process are currently underway. Construction Projects under Design (DD) involve the preparation of detailed design contract drawings and technical specifications for construction projects. Study (S) involves the preparation of engineering studies to review design alternatives and determine solutions. https://www.niagararegion.ca/living/water/pdf/capital-projects-brochure.pdf |
да, хотел предложить carry over project, но сбило с толку то, что словари МТ и Лингво дают значение "незавершённое строительство" для carry-over construction. |
|
link 23.10.2015 5:24 |
переходящее строительство=незавершенка=incomplete construction |
|
link 23.10.2015 5:42 |
Всем домо аригато, однако )) |
2 James Hadley Chase "переходящее строительство=незавершенка=incomplete construction" Со знаком равенства вы явно погорячились. "Переходящее стр-во" входит в понятие "незавершенка", но не всякая незавершенка = incomplete construction. "Состав незавершенного строительства изучается по разным направлениям: а) строящиеся объекты; http://www.bibl.nngasu.ru/electronic resources/uch-metod/economic_statistics/4566_Dmitriev_Statistika.pdf |
|