词典论坛联络

   俄语 英语
Google | Forvo | +
назначенный ресурс до капитального ремонта强调
一般 design time between overhauls (1500-hour design time between overhauls, also designated as the GO-300. WK Alexander Demidov)
assigned lifetime to overhaul (petr1k)