| critical path | |
| 微软 | المسار الحرج; مسار هام |
| scheduling | |
| 经济 | جدولة; برمجة |
| |||
| المسار الحرج (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project) ؛مسار هام (The series of tasks that must be completed on schedule for a project to finish on schedule. Each task on the critical path is a critical task) | |||
| مسلك حرج | |||
|