| |||
VAC (The earned value field that shows the difference between the budget at completion [BAC] and the estimate at completion [EAC]. In Project, the EAC is the Total Cost field, and the BAC is the Baseline Cost field) | |||
| |||
ana- (Prefix meaning a condensed double aromatic nucleus substituted in the 1.5 positions) | |||
Німецький тезаурус | |||
| |||
antinukleäre Antikörper | |||
| |||
Artillerie-Nachrichtenabteilung |
ana: 5 фраз в 2 тематиках |
Біологія | 3 |
Природні ресурси та охорона природи | 2 |