![]() |
| |||
| chemin critique | |||
| chemin critique (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project) | |||
| indispensables m | |||
| |||
| chemin critique (méthode PERT) | |||
|
critical-path : 23 фрази в 6 тематиках |
| Авіація | 1 |
| Економіка | 10 |
| Інформаційні технології | 7 |
| Майкрософт | 2 |
| Політика | 1 |
| Фінанси | 2 |