![]() |
| |||
| target cost; estimated costs | |||
| budget costs | |||
| budgeted costs | |||
| budgeted cost | |||
| budget at completion (The original project, resource, and assignment cost as shown in the baseline plan. The baseline cost is a snapshot of the cost at the time when the baseline plan was saved) | |||
| planned cost | |||
| standard cost | |||
| planned costs; scheduled costs; target costs | |||
| |||
| standard costs | |||