| critical path | |
| ekon. | مسلك حرج |
| scheduling | |
| ekon. | جدولة; برمجة |
| |||
| مسلك حرج | |||
| المسار الحرج (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project) ؛مسار هام (The series of tasks that must be completed on schedule for a project to finish on schedule. Each task on the critical path is a critical task) | |||
|
critical path : 9 do fraz, 4 tematyki |
| Ekonomia | 3 |
| Ład korporacyjny | 2 |
| Leśnictwo | 2 |
| Microsoftu | 2 |