| |||
chemin critique (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project) | |||
chemin critique | |||
indispensables m | |||
| |||
chemin critique (méthode PERT) |
critical path : 23 phrases in 6 subjects |
Aviation | 1 |
Economics | 10 |
Finances | 2 |
Information technology | 7 |
Microsoft | 2 |
Politics | 1 |