law, court |
издержки и компенсация (*напр., за нанесённый ущерб, за простой по вине заказчика или за недоброкачественную работу подрядчика • The 2024 lawsuit the city filed against the three contractors alleged several defects and deficiencies, including failing to apply caulking, improperly applying sealer and installing faulty rubber troughs that allowed salty water to spill on to the structure below. It said Associated Engineering designed and inspected the work, Graham was general contractor and Ross Rex was the painting subcontractor, and it sought unspecified costs and damages. (vancouversun.com) ART Vancouver) |