critical path | |
comp., MS | ruta crítica |
method | |
gen. | metodo |
commun. | metodología |
environ. | método |
mater.sc. el. | método; procedimiento |
math. | el método |
| |||
ruta crítica (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project) | |||
camino crítico; ruta crítica |
critical-path : 13 phrases in 4 subjects |
Economics | 4 |
Information technology | 5 |
Microsoft | 2 |
Politics | 2 |