critical path | |
comp., MS | ruta crítica |
analysis | |
agric. | descomposición |
commun. chem. | análisis |
environ. | análisis |
life.sc. | diagnóstico |
math. | el análisis |
pharma. environ. | ensayo |
| |||
ruta crítica (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project) | |||
camino crítico; ruta crítica |
critical-path : 14 phrases in 4 subjects |
Economics | 4 |
Information technology | 5 |
Microsoft | 3 |
Politics | 2 |