중요 경로 (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project); 요주의 경로 (The series of tasks that must be completed on schedule for a project to finish on schedule. Each task on the critical path is a critical task) |