critical path | |
comp., MS | κρίσιμη διαδρομή |
method | |
environ. | μέθοδος |
med. | μέθοδος |
| |||
κρίσιμη διαδρομή (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project) |
critical-path : 6 phrases in 2 subjects |
Economics | 1 |
Information technology | 5 |