critical path

gen. kritischer Pfad
comp., MS kritischer Weg (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project); kritischer Pfad (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project)
proj.manag. kritischer Weg
critical-path