DictionaryForumContacts

Google | Forvo | +
critical-path
 critical path abbr.
gen. kritischer Pfad
comp., MS kritischer Weg; kritischer Pfad
| method
 method abbr.
gen. Art und Weise; Methode; Verfahren; Verfahrensweise; Weg; Vorgehen
environ. Methode
mater.sc. el. Arbeitsverfahren
stat. Methoden

to phrases

critical path

gen. kritischer Pfad
comp., MS kritischer Weg (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project); kritischer Pfad (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project)
proj.manag. kritischer Weg
critical-path
: 31 phrases in 7 subjects
Business5
Economics8
Finances1
Information technology7
Microsoft1
Operations research4
Technology5

Add | Report an error | Get short URL | Language Selection Tips