DictionaryForumContacts

Forum: English - RussianThreads started by urusal

6 1209  stand-by case  law urusal  20.07.2006  10:59
3 204  mandated shutdown  law urusal  19.07.2006  17:14
4 259  Пункт договора  law urusal  19.07.2006  13:29
73  primary vibrator computer analysis system  urusal  19.07.2006  10:49
103  Raw ground-force  urusal  18.07.2006  22:34
83  Energy source system time-zero calibration.  urusal  18.07.2006  16:48
1 101  line opening operational (Dozing) crews  urusal  18.07.2006  10:52
89  Linear Move Out Stack  urusal  17.07.2006  17:03
2 100  "Fold simulation"  geol. urusal  17.07.2006  13:25
2 127  recorded fold of coverage multiplicity  geol. urusal  14.07.2006  15:01
54  tail portions of the lines  geogr. urusal  14.07.2006  13:35
1 218  negative voltage input,white trough on the monitor  el. urusal  13.07.2006  23:06
2 164  staked locations  geol. urusal  13.07.2006  18:09
72  maximum line location movement  urusal  13.07.2006  16:54
3 108  working vibrator options  geol. urusal  13.07.2006  14:14
3 132  Instrument Supervisor  geol. urusal  12.07.2006  16:43
3 98  "to process and display field noise tests"  urusal  12.07.2006  14:14
3 130  line terminations,line intersections  geol. urusal  12.07.2006  13:03
1 91  National Geodetic Network and Mapping  urusal  12.07.2006  12:04
3 270  Sweeps per VP  geol. urusal  12.07.2006  10:02
3 141  The millions place for the False Easting  urusal  11.07.2006  23:30
1 104  Recording Notch Filters  geol. urusal  11.07.2006  22:56
1 108  Radio similarity analysis,Wire-line similarity  geol. urusal  11.07.2006  17:57
1 121  Hi cut Anti-Aliasing Filters  geol. urusal  11.07.2006  17:17
1 102  3-D vibrator seismic data acquisition crew  urusal  10.07.2006  15:28
2 134  EDM prisms, instrument  geol. urusal  10.07.2006  13:52
1 165  the termination of any elevation traverse  geol. urusal  10.07.2006  11:24
5 486  permanent markers; control points  geol. urusal  10.07.2006  10:01
1 151  turn-key rates  econ. urusal  7.07.2006  15:20
12 304  will be held at the crew level  urusal  4.07.2006  16:24
5 153  data acquisition recording instrumentation  urusal  4.07.2006  12:38
Pages 1 2 3 4 5 6 7 8 9 10 11 12

Get short URL