5 | 208 | design closure Delta P per the On / Off valve schedule. O&G. tech. | 77 | 1.09.2006 | 9:30 |
1 | 129 | Minimum Shop Inspection O&G. tech. | 77 | 31.08.2006 | 10:00 |
4 | 185 | export crating | 77 | 20.07.2006 | 8:54 |
68 | PSL4 gas tested met. | 77 | 18.07.2006 | 15:03 | |
1 | 46 | cycle increment qual.cont. | 77 | 18.07.2006 | 10:14 |
1 | 132 | at 1.1 times qual.cont. | 77 | 17.07.2006 | 13:31 |
2 | 92 | PR2 rating qual.cont. | 77 | 17.07.2006 | 12:44 |
9 | 153 | overlay procedure met. | 77 | 15.07.2006 | 11:45 |
3 | 125 | The value of the Letter of Intent law | 77 | 11.07.2006 | 14:42 |
1 | 90 | unlagged pipe, lethal service O&G | 77 | 10.07.2006 | 14:33 |