DictionaryForumContacts

Terms for subject Microsoft containing programacion | all forms
GalicianEnglish
Asistente de programaciónScheduling Assistant (An Outlook and Outlook Web Access feature that automatically suggests the best meeting times for a given a group of attendees, allowing users to schedule people and resources quickly and efficiently)
Interface de programación de aplicacións criptográficasCryptography Application Programming Interface (An (API) that is provided as part of Microsoft Windows. CryptoAPI provides a set of functions that allow applications to encrypt or digitally sign data in a flexible manner while providing protection for the user's sensitive private key data. Actual cryptographic operations are performed by independent modules known as (CSPs))
Interface de programación de aplicacións de mensaxeríaMessaging Application Programming Interface (A messaging architecture that enables multiple applications to interact with multiple messaging systems across a variety of hardware platforms. MAPI is built on the Component Object Model (COM) foundation)
Interface de programación de aplicacións para servidores de internetInternet Server Application Programming Interface An application programming interface (API) that resides on a server computer for initiating software services tuned for Windows operating systems. In Microsoft Provisioning System, ISAPI resides on the Web server (ISAPI)
linguaxe de programaciónprogramming language (An artificial language that specifies instructions to be executed on a computer. The term covers a wide spectrum, from binary-coded machine language to high-level languages)
Programación da claseClass Schedule (A view in which you can organize class materials into assignments and lessons)
Visualización de programaciónSchedule View (An Outlook Calendar view in which each calendar is listed vertically (not side-by-side). This view is optimized for viewing a schedule for a group and scheduling a meeting for a group)
Índice de desempeño de programaciónschedule performance index The ratio of the earned value (EV), which is sometimes referred to as the budgeted cost of work performed (BCWP), to the planned value (PV), which is sometimes referred to as the budgeted cost of work scheduled (BCWS). SPI is often used to estimate the project completion date. The SPI value is calculated as follows: SPI = EV/PV. If the resulting SPI value is less than 1.0, that indicates that less work was completed on the project than was planned. If the SPI value is 1.0 or greater, that indicates that more work was completed than was planned; SPI (SPI)

Get short URL