comp., MS | administrative task | 管理工作 (An operation that can only be performed by an administrator, not a standard user) |
comp., MS | assigned task | 指定工作 (A task that has been sent to someone as a task request in an e-mail message. When you assign a task, you give up ownership of it (unless the assignee declines it). The assigner can receive status reports for the task) |
comp., MS | background task | 背景工作 (A task that is part of an operating system or program, and is operating without interaction with the user while the user is working on another task) |
comp., MS | Business Data Task Panes Gallery | 商務資料工作窗格檔案庫 (The site collection level gallery containing the XML metadata files that define task pane layouts displaying business data in external data parts) |
comp., MS | business task | 商務工作 (A work-related action item that can be tracked through completion. A business task may occur once or repeatedly) |
comp., MS | Change the task status to Completed and close the form | 將工作狀態變更為 已完成 並結束表單 (Check box that indicates if the user wants to have the task marked as completed after it has been converted to an opportunity) |
comp., MS | Create Task Wizard | 建立工作精靈 (A wizard that allows the user to create new tasks that can be run in different locations, for example, in the Operator console or on an agent-managed computer) |
comp., MS | critical task | 關鍵任務 (A task that must be completed on schedule for the project to finish on time. If a critical task is delayed, the project completion date might also be delayed. A series of critical tasks makes up a project's critical path) |
comp., MS | custom task pane | 自訂工作窗格 (An .html file whose content is displayed in a window next to a form. Custom task panes can provide form-specific commands and Help content) |
comp., MS | Custom Task Wizard | 自訂工作精靈 (A wizard that will help users to define a custom task for their workflow. Custom Task can be used to collect information from workflow participants. That information will be stored in the Tasks list for the site and can be used later in the workflow via workflow lookup) |
comp., MS | Daily Task List | 每日工作清單 (" The name of a pane at the bottom of the Calendar module where tasks are displayed. Tasks that are completed on a particular day "stick" to the day and are shown as a record of what work was performed on that day. Tasks not completed roll over to the next day and accumulate until completed.") |
comp., MS | data flow task | 資料流程工作 (The task that encapsulates the data flow engine that moves data between sources and destinations, providing the facility to transform, clean, and modify data as it is moved) |
comp., MS | development task | 開發工作 (An assigned unit of development work usually created to build part of a scenario or quality of service requirement. The development task describes the objective of the developer in the context of an iteration) |
comp., MS | external task | 外部任務 (A task that represents a linked task in another project, providing an easy way to review the attributes of linked tasks without switching between projects. An external task can be changed only in the source project) |
comp., MS | fixed-duration task | 固定工期的排程 (A task in which the duration is a fixed value and any changes to the work or the assigned units [that is, resources] don't affect the task's duration. This is calculated as follows: Duration x Units = Work) |
comp., MS | Format Object task pane | 格式化物件工作窗格 (A task pane that provides functionality for formatting objects) |
comp., MS | Initial Configuration Tasks | 初始設定工作 (A window that, by default, opens immediately after operating system installation is complete and each time a member of the Administrators group logs on to the computer. By using commands in the Initial Configuration Tasks window, you can complete the configuration required to identify the computer to other computing resources on your network, secure the computer, enable administrators to perform tasks on the computer, and customize the computer by adding roles or features) |
comp., MS | Internet Engineering Task Force | 網際網路工程任務推動小組 (A worldwide organization of individuals interested in networking and the Internet. Managed by the IESG (Internet Engineering Steering Group), the IETF is charged with studying technical problems facing the Internet and proposing solutions to the IAB. The work of the IETF is carried out by various Working Groups that concentrate on specific topics, such as routing and security) |
comp., MS | lightweight task | 輕量型工作 (In the Concurrency Runtime, an asynchronous function call. A lightweight task is typically shorter-running and contains less internal state than an asynchronous agent, and the caller is not notified when the task is completed) |
comp., MS | Monitoring task area | 監視工作區域 (An area in DPS Management Console that displays alerts when problems or certain events occur. It also shows a list of jobs running, completed and scheduled for a selected time period, allowing the user to monitor the status of data protection and data recovery) |
comp., MS | My Tasks | 我的工作 (A feature that provides a search-based aggregation of tasks assigned to a My Site user across SharePoint, Project Server and Exchange to help the user organize and complete these tasks) |
comp., MS | project summary task | 專案摘要任務 (A task that summarizes the duration, work, and costs of all tasks in a project. The project summary task appears at the top of the project, its ID number is 0, and it presents the project's timeline from start to finish) |
comp., MS | project task | 專案工作 (One of the tasks that comprise the tasks in a business project) |
comp., MS | Project Tasks | 專案任務 (A SharePoint Web Part that displays a list of tasks as well as the Gantt chart of the schedule for these tasks) |
comp., MS | Project Tasks | 專案工作 (A SharePoint Web Part that displays a list of tasks as well as the Gantt chart of the schedule for these tasks) |
comp., MS | recurring task | 週期性任務 (A task that occurs repeatedly during the course of a project. For example, you might define the weekly status meeting as a recurring task) |
comp., MS | report task | 報告工作 (A task that specifies which reports to generate and what parameters to use; which volumes and folders to report on; how often to generate the reports; and which file formats to save them in) |
comp., MS | Smart Task | 智慧工作提示 (A small panel that is attached to the upper right-hand corner of a .NET control. When the panel is opened, it contains checkboxes and combo boxes that enables developers to select connectivity and other options for the control) |
comp., MS | split task | 分割任務 (A task that is scheduled for non-contiguous periods of time. For example, a two-day task that does not require contiguous work might be split so that the first day of work is scheduled for Monday, and the second day is scheduled for Thursday) |
comp., MS | summary task | 摘要任務 (A task that is made up of subtasks and summarizes those subtasks. Use outlining to create summary tasks. Project automatically determines summary task information [such as duration and cost] by using information from the subtasks) |
comp., MS | task area | 工作區域 (A grouping of related tasks in DPM Administrator Console. The console has five task areas: Monitoring, Protection, Recovery, Reporting, and Management) |
comp., MS | task calendar | 任務行事曆 (The base calendar that you can apply to individual tasks to control their scheduling, usually independent of the project calendar or any assigned resources' calendars. By default, all tasks use the project calendar) |
comp., MS | task chain | 工作鏈結 (A sequence of tasks that are defined in a job template so that tasks act on the output of preceding tasks in a workflow) |
comp., MS | task delegation | 任務委派 (The process of one team member assigning a task to another team member in Project Server. When a task is delegated to another team member, that team member actually does the work on the task) |
comp., MS | task dependency | 任務相依性 (A relationship between two linked tasks; linked by a dependency between their finish and start dates. There are four kinds of task dependencies: Finish-to-start [FS], Start-to-start [SS], Finish-to-finish [FF], and Start-to-finish [SF]) |
comp., MS | task form | 工作表單 (A narrow and long form that appears in the task pane, which is used to view and edit related data for lookups) |
comp., MS | task group | 工作群組 (In the Concurrency Runtime, a construct that enables related, fine-grained tasks to be queued to a Task Scheduler. A task group can be used to schedule tasks, wait for tasks to finish, and cancel tasks that have not started) |
comp., MS | task ID | 任務識別碼 (A number that Project automatically assigns to a task as you add it to the project. The task ID indicates the position of the task with respect to the other tasks) |
comp., MS | task information | 任務資訊 (Information provided about a specific task) |
comp., MS | task input panel | 工作輸入面板 (" A small space on the To-Do Bar where the user can input tasks directly. The default label reads "Type a new task".") |
comp., MS | Task Launcher | 家庭工作室 (The starting point for all Works programs, contacts, appointments, templates and projects in one easy to use location) |
comp., MS | task list | 工作清單 (A list of tasks that appears in the Tasks folder and in the TaskPad in Calendar) |
comp., MS | Task List | 工作清單 (A list of tasks that appears in the Tasks folder and in the TaskPad in Calendar) |
comp., MS | Task Manager | 工作管理員 (A tool that provides information about programs and processes running on the computer. Using Task Manager, you can end or run programs, end processes, and display a dynamic overview of your computer's performance) |
comp., MS | task-oriented Help | 工作導向說明 (A type of Help that present the steps involved in carrying out a particular task) |
comp., MS | task pane | 工作窗格 (A window within an Office application that provides commonly used commands. Its location and small size allow you to use these commands while still working on your files) |
comp., MS | task pane app | 工作窗格應用程式 (An app for Office that resides within a task pane in a client application) |
comp., MS | task pane app for Office | Office 相關工作窗格應用程式 (An app for Office that resides within a task pane in a client application) |
comp., MS | task path | 任務路徑 (A series of tasks that includes the predecessors and successors to the task that is selected) |
comp., MS | task report | 任務報表 (Printed information about a project's tasks or activities. Task reports usually include information about start dates, work completed, and expected durations) |
comp., MS | task request | 工作要求 (A request sent in an e-mail message asking the recipient to complete a task. If the recipient accepts the task, it is added to the recipient's task list, and the recipient becomes the new owner of the task) |
comp., MS | Task Scheduler | 工作排程器 (A tool which enables users to automatically perform routine tasks on a chosen computer by monitoring whatever criteria the users choose to initiate the tasks (referred to as triggers) and then executing the tasks when the criteria is met) |
comp., MS | Task Scheduler Wizard | 工作排程器精靈 (A Windows Vista wizard that allows users to set up tasks with Task Scheduler) |
comp., MS | task sequence | 工作順序 (The mechanism in Configuration Manager for performing multiple steps or tasks on a client computer at the command-line level without requiring user intervention) |
comp., MS | task template | 工作範本 (An XML file that describes a task's configurable properties) |
comp., MS | task type | 任務類型 (A characterization of a task based on which aspect of the task is fixed and which aspects are variable. There are three task types: Fixed Units, Fixed Work, and Fixed Duration. The default task type in Project is Fixed Units) |
comp., MS | task view | 任務檢視 (A view that displays task information. Task views include three task forms; examples include Calendar, Detail Gantt, Gantt Chart, Milestone Rollup, PA_PERT Entry Sheet, Task Entry, Relationship Diagram, Task Sheet, and Task Usage) |
comp., MS | Task Well | 工作告示區 (An area in the Outlook Calendar module where users can display the tasks and other items assigned to that day (or week)) |
comp., MS | task workspace | 任務工作區 (A workspace used to store tasks and also to provide end-user collaboration for them. A Task Workspace Locator List is required to locate the appropriate workspace for a particular task type) |
comp., MS | Task Workspace Locator List | 任務工作區定位程式清單 (A list that is used to look up the location of a task workspace, given the details of the task type) |
comp., MS | Tasks pane | 工作窗格 (A pane in the Service Manager console that contains tasks that a user can perform) |
comp., MS | Tasks peek | 工作預覽 (A contextual summary of the user's task list, which is displayed in a callout without switching to the Tasks module) |
comp., MS | test task | 測試工作 (An assignment to create test cases and test a specific area of the product, usually in the context of a scenario or quality of service requirement) |
comp., MS | Work Management Task Sync | Work Management 工作同步處理 (A component of the Work Management Service that synchronizes tasks with systems outside of SharePoint, such as an Exchange mailbox, to enable task management in Outlook) |