Subject | English | Chinese simplified |
comp., MS | budget schedule | 预算计划 (A schedule for the planned expenditure of allocated financial resources) |
comp., MS | Class Schedule | 课程表 (A view in which you can organize class materials into assignments and lessons) |
comp., MS | delivery schedule | 交货计划 (A schedule for the planned delivery of products) |
comp., MS | file replication schedule | 文件复制计划 (The schedule by which Directory Services user lists that are newly uploaded are added to the Administration Center and to e-mail servers worldwide) |
comp., MS | finite scheduling | 有限计划编制 (A scheduling method that assumes that limited capacity for labor and machines is available) |
comp., MS | job schedule | 作业日程安排 (The optimal dates and times for performing jobs at a work center) |
comp., MS | master project schedule | 主项目时间表 (A schedule that identifies all the project's activities and milestones, consolidating all team and role schedules. The master project schedule is a deliverable of the planning phase) |
comp., MS | master scheduling | 主计划编制 (The process for generating a timetable for matching supply with demand) |
comp., MS | personal schedule | 个人计划 (A schedule of activities that are not related to work) |
comp., MS | process scheduling | 过程计划 (The assignment of business intelligence tasks for users, roles, and PerformancePoint Planning Server) |
comp., MS | production schedule | 生产计划 (A schedule to produce a specific item and item quantity at a specific time and by specific human and operational resources) |
comp., MS | protection schedule | 保护日程安排 (A schedule that specifies whether the replica is synchronized with live data on the on an hourly or daily basis as well as the time when shadow copies of the replica are created) |
comp., MS | report-specific schedule | 报表特定计划 (Schedule defined inline with a report. Report-specific schedules are defined in the context of an individual report, subscription, or report execution operation to determine cache expiration or snapshot updates) |
comp., MS | Schedule a Conference... | 计划会议 (An item on the Actions menu that opens a new Outlook meeting invitation using the user's conferencing information) |
comp., MS | Schedule a Meeting | 安排会议 (A menu item that opens an Outlook meeting invitation prepopulated with the selected contact(s)) |
comp., MS | schedule group | 计划组 (In the Concurrency Runtime, a container for related tasks that are queued to a Task Scheduler) |
comp., MS | Schedule Important Software Updates | 安排重要软件更新工具 (A tool on the main Windows SteadyState interface used to set schedules for software and operating system updates) |
comp., MS | schedule performance index | 日程绩效指数 (The ratio of the earned value (EV), which is sometimes referred to as the budgeted cost of work performed (BCWP), to the planned value (PV), which is sometimes referred to as the budgeted cost of work scheduled (BCWS). SPI is often used to estimate the project completion date. The SPI value is calculated as follows: SPI = EV/PV. If the resulting SPI value is less than 1.0, that indicates that less work was completed on the project than was planned. If the SPI value is 1.0 or greater, that indicates that more work was completed than was planned; SPI) |
comp., MS | schedule variance | 日程差异 (The difference between the budgeted cost of work performed [BCWP] and the budgeted cost of work scheduled [BCWS]. This is calculated as follows: SV = Budgeted Cost of Work Performed - Budgeted Cost of Work Scheduled) |
comp., MS | Schedule View | 日程安排视图 (An Outlook Calendar view in which each calendar is listed vertically (not side-by-side). This view is optimized for viewing a schedule for a group and scheduling a meeting for a group) |
comp., MS | shared schedule | 共享的计划 (Schedule information that can be referenced by multiple items) |
comp., MS | sync schedule | 同步日程安排 (The times that will trigger automatic synchronization between a device and Exchange Server every time an item arrives or is modified in Exchange Server) |
comp., MS | user-controlled scheduling | 用户控制计划 (A feature that allows the user to specify manual or automatic scheduling on a per-task basis) |
comp., MS | vesting schedule | 行权计划 (The manner in which-long term variable compensation is distributed to an employee. Long-term incentives are awarded at one time but distributed at a later time) |