Subject | English | Hebrew |
comp., MS | color index | אינדקס צבעים (An index mode that specifies colors as indexes into a palette instead of as levels of red, green, and blue) |
comp., MS | full-text index | אינדקס טקסט מלא (An index that enables full-text search for a group of managed properties) |
comp., MS | graph index | אינדקס גרף (An index structure that stores graph edges and their associated data such as actor, action, and object) |
comp., MS | index buffer | מאגר אינדקס (An area of memory which holds a table that contains reference information pointing to vertices in your vertex buffer) |
comp., MS | index entry | ערך אינדקס (A field code that marks specific text for inclusion in an index. When you mark text as an index entry, Microsoft Office Word inserts an XE (Index Entry) field formatted as hidden text) |
comp., MS | index partition | מחיצת אינדקס (A logical portion of the search index) |
comp., MS | index replica | עותק משוכפל של אינדקס (A copy of a search index within an index partition) |
comp., MS | index role | תפקיד אינדקס (The role name of a server that services indexing in the farm topology) |
comp., MS | index update | עדכון אינדקס (A physical operator that updates rows from its input in the nonclustered index specified in the Argument column) |
comp., MS | list index | אינדקס רשימה (The sequence of numbers for items in a list, starting with 0 for the first item, 1 for the second item, and so forth) |
comp., MS | maintainability index | אינדקס יכולת תחזוקה (A value between 0 and 100 that represents the relative ease of maintaining the code. A high value means better maintainability) |
comp., MS | package resource index file | קובץ אינדקס של משאב חבילה (A binary file used in Windows Store apps to store resources for all languages, cultures, and scale factors) |
comp., MS | schedule performance index The ratio of the earned value (EV), which is sometimes referred to as the budgeted cost of work performed (BCWP), to the planned value (PV), which is sometimes referred to as the budgeted cost of work scheduled (BCWS). SPI is often used to estimate the project completion date. The SPI value is calculated as follows: SPI = EV/PV. If the resulting SPI value is less than 1.0, that indicates that less work was completed on the project than was planned. If the SPI value is 1.0 or greater, that indicates that more work was completed than was planned; SPI | מדד ביצועי תזמון (SPI) |
comp., MS | unique index | אינדקס ייחודי (An index in which no two rows are permitted to have the same index value, thus prohibiting duplicate index or key values) |
comp., MS | Windows Experience Index | מדד חוויית Windows (A measure of the capability of your computer's hardware and software configuration, expressed in numbers called base score and subscore) |