DictionaryForumContacts

Terms containing index | all forms | exact matches only
SubjectEnglishHebrew
comp., MScolor indexאינדקס צבעים (An index mode that specifies colors as indexes into a palette instead of as levels of red, green, and blue)
comp., MSfull-text indexאינדקס טקסט מלא (An index that enables full-text search for a group of managed properties)
comp., MSgraph indexאינדקס גרף (An index structure that stores graph edges and their associated data such as actor, action, and object)
comp., MSindex bufferמאגר אינדקס (An area of memory which holds a table that contains reference information pointing to vertices in your vertex buffer)
comp., MSindex entryערך אינדקס (A field code that marks specific text for inclusion in an index. When you mark text as an index entry, Microsoft Office Word inserts an XE (Index Entry) field formatted as hidden text)
comp., MSindex partitionמחיצת אינדקס (A logical portion of the search index)
comp., MSindex replicaעותק משוכפל של אינדקס (A copy of a search index within an index partition)
comp., MSindex roleתפקיד אינדקס (The role name of a server that services indexing in the farm topology)
comp., MSindex updateעדכון אינדקס (A physical operator that updates rows from its input in the nonclustered index specified in the Argument column)
comp., MSlist indexאינדקס רשימה (The sequence of numbers for items in a list, starting with 0 for the first item, 1 for the second item, and so forth)
comp., MSmaintainability indexאינדקס יכולת תחזוקה (A value between 0 and 100 that represents the relative ease of maintaining the code. A high value means better maintainability)
comp., MSpackage resource index fileקובץ אינדקס של משאב חבילה (A binary file used in Windows Store apps to store resources for all languages, cultures, and scale factors)
comp., MSschedule performance index The ratio of the earned value (EV), which is sometimes referred to as the budgeted cost of work performed (BCWP), to the planned value (PV), which is sometimes referred to as the budgeted cost of work scheduled (BCWS). SPI is often used to estimate the project completion date. The SPI value is calculated as follows: SPI = EV/PV. If the resulting SPI value is less than 1.0, that indicates that less work was completed on the project than was planned. If the SPI value is 1.0 or greater, that indicates that more work was completed than was planned; SPIמדד ביצועי תזמון (SPI)
comp., MSunique indexאינדקס ייחודי (An index in which no two rows are permitted to have the same index value, thus prohibiting duplicate index or key values)
comp., MSWindows Experience Indexמדד חוויית Windows (A measure of the capability of your computer's hardware and software configuration, expressed in numbers called base score and subscore)

Get short URL