DictionaryForumContacts

Terms containing PLANS | all forms
SubjectEnglishKorean
comp., MSactive power plan현재 전원 관리 옵션 (The power plan that is currently selected in Power Options in Control Panel)
comp., MSactivity plan작업 계획 (A schedule for planning the activities that often follow the completion of a project)
ITaudit plan감사 계획
comp., MSbaseline plan초기 계획 (The original project plans [up to 11 per project] used to track progress on a project. The baseline plan is a snapshot of your schedule at the time that you save the baseline and includes information about tasks, resources, and assignments)
comp., MSbuilding plan건물 설계 (A general category that could represent a floor plan, home plan, or other layout)
comp., MSbuild-to-plan계획 후 생산 방식 (Pertaining to the process of manufacturing computers according to a general specification)
ITbusiness continuity plan비즈니스 연속성 계획 (BCP)
ITcontingency plan비상계획
comp., MScontingency plan대체 계획 (A plan for addressing recognized risks that may arise during the course of a project. The plan identifies alternative strategies to be used to ensure project success if specified risk events occur)
math.continuous sampling plans연속표집계획
comp., MSdata generation plan데이터 생성 계획 (A file that contains information about a particular database schema and how Data Generator will generate data for it)
comp., MSdata plan데이터 요금제 (A standardized service agreement between a cell phone user and a mobile operator that establishes data service details such as pricing, types of services, and bandwidth)
comp., MSDevelop Skills Needs - Hiring Plan - Hiring Forecast기술 개발 요구 사항 - 고용 계획 - 고용 예측 (A template that provides a framework for the general activities, from a Human Resources departmental perspective, that are undertaken to perform an analysis of forecasted skills needs and the potential hiring and/or training plans needed to address the gap between needed skills and available skills)
comp., MSdial plan다이얼 플랜 (A grouping of telephony users with some specific properties, such as unique telephone extension numbers, that allow the Private Branch eXchange (PBX) to determine what action to take with dialed digits)
ITdisaster recovery plan재난 복구 계획
ITdisaster recovery plan DRP walk-through재난 복구 계획 현장 검사Walk-through
math.Dodge continuous sampling plan닷지 연속 샘플링 계획
comp., MSExecution Plan pane실행 계획 창 (One of the tabs that hosts the output for an estimated or actual execution plan that SQL Server uses)
comp., MSfloor plan평면도 (A drawing that shows the layout of individual rooms or entire floors of a building including the wall structure, building core, and electrical symbols. A type of building plan)
comp., MShome plan집 설계 (A drawing that shows the layout of a house. It can be used to draw new house plans or remodeling plans, kitchen and furniture arrangements, or plans to add a new room to your home. A type of building plan)
comp., MSHVAC planHVAC 설계 (A drawing that shows the layout of heating, ventilation, and cooling ductwork. A type of building plan)
ITincident response plan침해사고 대응 계획
comp., MSinterim plan중간 계획 (A set of task start and finish dates that you can save at certain stages of your project. You can compare an interim plan with the baseline plan or current plan to monitor project progress or slippage. You can save up to 10 interim plans)
ITIT strategic planIT 전략 계획
ITIT tactical planIT 전술 계획
comp., MSiteration plan반복 계획 (The list of scenarios, quality of service requirements, and tasks for the upcoming iteration)
comp., MSlearning plan학습 계획 (A list of required and elective courses that are taken to satisfy a goal. Required courses can be based on Microsoft corporate mandates; company-wide, business-group or regional initiatives; or the learner's career stage profile)
stat.loop plan닫힌 곡선평면
stat.loop plan되돌림평면
math.loop plan되돌림평면, 닫힌 곡선평면
comp., MSmailbox plan사서함 계획 (A template that automatically populates multiple mailbox properties when a mailbox is created in the service. A mailbox plan also assigns default permissions to the corresponding user account)
comp., MSmaster project plan마스터 프로젝트 계획 (A deliverable of the planning phase for a development project. It consolidates feature team and role plans. The master project plan includes a budget plan, capacity plan, communications plan, deployment plan, development plan, pilot plan, purchasing and facilities plan, security plan, test plan, and training plan)
comp., MSmetered data plan데이터 요금제 (A mobile broadband or other network or data plan that bills according to data use, such as megabytes downloaded, messages sent, or webpages viewed)
comp., MSnon-peak power plan사용량 감소 시 전원 계획 (A Configuration Manager power plan that you can configure with power settings that are applied outside peak hours or business hours)
comp., MSpeak power plan사용량 증가 시 전원 계획 (A Configuration Manager power plan that you can configure with power settings that are applied during the peak hours or business hours that you specify)
comp., MSPlan A gateway플랜 A 게이트웨이 (A SIP-PSTN gateway that meets the Unified Communications specifications)
comp., MSplan guide계획 지침 (A SQL Server module that attaches query hints to queries in deployed applications, without directly modifying the query)
comp., MSpower plan전원 계획 (A group of Windows-based power settings that you can apply to computers by using Configuration Manager power management)
comp., MSpower plan전원 관리 옵션 (A group of preset power-management options. For example, you can set elapsed times for putting your computer on standby and for turning off your monitor and hard disk. You save these settings as a named power scheme)
comp., MSproject plan프로젝트 계획 (A formal, approved document used to guide both project execution and project control)
comp., MSquery plan쿼리 계획 (An internal strategy by which a database server tries to create result sets quickly)
math.repetitive group sampling plan반복그룹표집계획
comp., MSResource Plans자원 계획 (A feature that allows users to allocate resources or document resource requirements, in the absence of a detailed project plan containing resource assignments)
comp., MSrisk management plan위험 관리 계획 (A document defining how risk will be managed throughout the project. It can include identified risks, probabilities, contingency plans and methods for implementing them, and a strategy for allocating resources if a risk event occurs)
comp., MSrollout plan출시 계획 (The plan for delivering an external release. This plan includes all of the elements that must be put in place for acceptance in the marketplace, operations, or to a customer)
math.sample plan표집설계
math.sample plan조사설계
math.sample plan표집계획
math.sampling plan조사설계
math.sampling plan표집계획
math.sampling plan표집설계
comp., MSservice plan서비스 계획 (A collection of Exchange features, organization-wide resource limits, and permissions that are automatically configured or applied when a new hosted organization is provisioned in the service)
comp., MSservice plan template서비스 계획 템플릿 (An XML file used to define the elements of a service plan or a mailbox plan)
math.single sampling plan일회 샘플링 계획
comp., MSsite plan단지 계획 (A drawing used for residential and commercial landscape design, parks planning, yard layouts, plat maps, outdoor recreational facilities, and irrigation systems. Uses a scale of 1:200. A type of building plan)
comp., MSspace plan공간 설계 (A drawing that uses Space shapes and resource shapes to track the approximate location of resources in a building. A type of building plan)
comp., MSstorage plan요금제 (A subscription that provides a certain amount of online storage space)
comp., MSsubscription plan구독 계획 (The type of Windows Azure subscription that describes the billing rate and other charges)
ITtechnology infrastructure plan기술 인프라 계획
comp., MStest plan테스트 계획 (A set of test cases and their associated test configuration information and the iteration when it is planned to run these tests. The test cases can be organized into a test suite hierarchy)
math.variable lot size plan다변수 크기 설계
math.wedge plans닫힌 순차적 t검정검증
stat.wedge plans닫힌 순차적 t검정

Get short URL