Subject | English | Korean |
comp., MS | At Least N Matches | 최소 N개 일치 (A menu item that allows the user to search for any pattern A that is represent in pattern B at least n times. Patterns could be strings, characters, etc) |
comp., MS | At Most N Matches | 최대 N개 일치 (A menu item that allows the user to search for any pattern A that is represent in pattern B at most n times. Patterns could be strings, characters, etc) |
comp., MS | at sign | 기호 (The separator between account names and domain names in Internet e-mail addresses) |
comp., MS | at sign | > 기호 (The separator between account names and domain names in Internet e-mail addresses) |
comp., MS | budget at completion | 작업 완료 시 예산 비용 (The original project, resource, and assignment cost as shown in the baseline plan. The baseline cost is a snapshot of the cost at the time when the baseline plan was saved) |
comp., MS | estimate at completion | 작업 완료 시 추정 비용 (The expected total cost of a task or project, based on performance as of the status date. EAC is calculated as follows: EAC = ACWP + (BAC-BCWP)/CPI) |
comp., MS | look-at point | 관측 대상 지점 (The point in the 3D world where the camera is supposed to point. By default, this is the origina (0,0,0). Typically the look-at point specifies where light is focused) |
stat. | missing at random | 랜덤결측 |
stat. | missing at random | 임의결측 |
math. | missing at random | 랜덤결측, 임의결측 |
math. | missing completely at random | 완벽한 무작위 결측 |
comp., MS | Preparation of an Opening Balance Sheet at the Date of Transition to IFRS | IFRS로의 전환일 당시 개시 대차대조표 준비 (A template that addresses, from a Finance & Accounting perspective, the significant activities required of companies to prepare their opening balance sheet at the date of transition to IFRS within the context of a conversion from previous Generally Accepted Accounting Principles (GAAP) to International Financial Reporting Standards (IFRS)) |
comp., MS | purchase at download | 다운로드 시 구입하다 (To purchase an app just before downloading and installing it) |
comp., MS | variance at completion | 작업 완료 시 비용 차이 (The earned value field that shows the difference between the budget at completion [BAC] and the estimate at completion [EAC]. In Project, the EAC is the Total Cost field, and the BAC is the Baseline Cost field) |