Subject | English | Norwegian Bokmål |
comp., MS | budget schedule | budsjettplan (A schedule for the planned expenditure of allocated financial resources) |
comp., MS | Class Schedule | timeplan (A view in which you can organize class materials into assignments and lessons) |
comp., MS | delivery schedule | leveringsplan (A schedule for the planned delivery of products) |
comp., MS | finite scheduling | begrenset tidsplanlegging (A scheduling method that assumes that limited capacity for labor and machines is available) |
environ. | fixed schedule of charges | fastpris |
comp., MS | job schedule | finplanlegging (The optimal dates and times for performing jobs at a work center) |
comp., MS | master scheduling | hovedplanlegging (The process for generating a timetable for matching supply with demand) |
comp., MS | personal schedule | personlig tidsplan (A schedule of activities that are not related to work) |
comp., MS | production schedule | produksjonsplan (A schedule to produce a specific item and item quantity at a specific time and by specific human and operational resources) |
comp., MS | Schedule a Conference... | Planlegg en konferanse... (An item on the Actions menu that opens a new Outlook meeting invitation using the user's conferencing information) |
comp., MS | Schedule a Meeting | Planlegg et møte (A menu item that opens an Outlook meeting invitation prepopulated with the selected contact(s)) |
comp., MS | schedule performance index | tidsplaneffektivitetsindeks (The ratio of the earned value (EV), which is sometimes referred to as the budgeted cost of work performed (BCWP), to the planned value (PV), which is sometimes referred to as the budgeted cost of work scheduled (BCWS). SPI is often used to estimate the project completion date. The SPI value is calculated as follows: SPI = EV/PV. If the resulting SPI value is less than 1.0, that indicates that less work was completed on the project than was planned. If the SPI value is 1.0 or greater, that indicates that more work was completed than was planned; SPI) |
comp., MS | schedule variance | tidsplanavvik (The difference between the budgeted cost of work performed [BCWP] and the budgeted cost of work scheduled [BCWS]. This is calculated as follows: SV = Budgeted Cost of Work Performed - Budgeted Cost of Work Scheduled) |
comp., MS | Schedule View | Planleggingsvisning (An Outlook Calendar view in which each calendar is listed vertically (not side-by-side). This view is optimized for viewing a schedule for a group and scheduling a meeting for a group) |
comp., MS | sync schedule | synkroniseringsplan (The times that will trigger automatic synchronization between a device and Exchange Server every time an item arrives or is modified in Exchange Server) |
comp., MS | user-controlled scheduling | brukerkontrollert planlegging (A feature that allows the user to specify manual or automatic scheduling on a per-task basis) |
comp., MS | vesting schedule | overdragelsesplan (The manner in which-long term variable compensation is distributed to an employee. Long-term incentives are awarded at one time but distributed at a later time) |