DictionaryForumContacts

Terms containing critical-path | all forms | exact matches only | in specified order only
SubjectEnglishGerman
IT, dat.proc.to crash the critical pathden kritischen Pfad verkürzen
comp., MScritical pathkritischer Weg (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project)
proj.manag.critical pathkritischer Weg
comp., MScritical pathkritischer Pfad (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project)
gen.critical pathkritischer Pfad
econ.critical path analysisAnalyse durch den kritischen Weg
busin.critical path analysisNetzplantechnik
econ.critical path analysisAnalyse durch den kritischen mit der Methode des kritischen Weges
fin.Critical Path AnalysisNetzplantechnik Critical Path Analysis
ITcritical path analysisPfadanalyse
ITcritical path analysisAnalyse des kritischen Pfades
busin.critical path analysisAnalyse des kritischen Wegs
econ.critical path methodMethode des kritischen Weges
busin., ITcritical path methodMethode des kritischen Wegs
ITcritical path methodMethode der Netzplantechnik
oper.res.Critical Path MethodCPM
busin., ITcritical path methodMethode des kritischen Pfads
comp., MScritical path methodMethode des kritischen Weges (A project management method of calculating the total duration of a project based on individual task durations and their dependencies)
ITcritical path methodNetzplantechnik
busin., ITcritical path methodKritische-Pfad-Methode
tech.critical path network analysisNetzplantechnik
tech.critical path network methodNetzplantechnik
tech.critical path network techniqueNetzplantechnik
econ.critical path planningMethode des kritischen Weges
oper.res.critical path schedulingNetzwerkplanung
ITcritical path schedulingMethode der kritischen Wege
oper.res.critical path schedulingPlanung nach der Methode des kritischen Weges
ITcritical path schedulingNetzplantechnik
oper.res.critical path schedulingNetzplanung
econ., lab.law.critical-path analysisAnalyse des kritischen Pfades
econ., lab.law.critical-path methodAnalyse des kritischen Pfades
tech.critical-path methodNetzplantechnik
tech.critical-path schedulingNetzplanung
econ.most critical pathkritischster Weg
comp., MSmultiple critical pathsmehrere kritische Wege (A series of tasks that must be completed on schedule for a project to finish on schedule. Identify and track multiple critical paths to be more effective in managing conditions that could affect your project's finish date)
econ.semi-critical pathhalbkritischer Weg

Get short URL