geplante Kosten(The original project, resource, and assignment cost as shown in the baseline plan. The baseline cost is a snapshot of the cost at the time when the baseline plan was saved)
Basisdomänencontroller(A domain controller used as the control for Group Policy Object (GPO) replication within that domain to which all GPO content is compared)