Subject | English | German |
IT, dat.proc. | to crash the critical path | den kritischen Pfad verkürzen |
comp., MS | critical path | kritischer Weg (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project) |
proj.manag. | critical path | kritischer Weg |
comp., MS | critical path | kritischer Pfad (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project) |
gen. | critical path | kritischer Pfad |
econ. | critical path analysis | Analyse durch den kritischen Weg |
busin. | critical path analysis | Netzplantechnik |
econ. | critical path analysis | Analyse durch den kritischen mit der Methode des kritischen Weges |
fin. | Critical Path Analysis | Netzplantechnik Critical Path Analysis |
IT | critical path analysis | Pfadanalyse |
IT | critical path analysis | Analyse des kritischen Pfades |
busin. | critical path analysis | Analyse des kritischen Wegs |
econ. | critical path method | Methode des kritischen Weges |
busin., IT | critical path method | Methode des kritischen Wegs |
IT | critical path method | Methode der Netzplantechnik |
oper.res. | Critical Path Method | CPM |
busin., IT | critical path method | Methode des kritischen Pfads |
comp., MS | critical path method | Methode des kritischen Weges (A project management method of calculating the total duration of a project based on individual task durations and their dependencies) |
IT | critical path method | Netzplantechnik |
busin., IT | critical path method | Kritische-Pfad-Methode |
tech. | critical path network analysis | Netzplantechnik |
tech. | critical path network method | Netzplantechnik |
tech. | critical path network technique | Netzplantechnik |
econ. | critical path planning | Methode des kritischen Weges |
oper.res. | critical path scheduling | Netzwerkplanung |
IT | critical path scheduling | Methode der kritischen Wege |
oper.res. | critical path scheduling | Planung nach der Methode des kritischen Weges |
IT | critical path scheduling | Netzplantechnik |
oper.res. | critical path scheduling | Netzplanung |
econ., lab.law. | critical-path analysis | Analyse des kritischen Pfades |
econ., lab.law. | critical-path method | Analyse des kritischen Pfades |
tech. | critical-path method | Netzplantechnik |
tech. | critical-path scheduling | Netzplanung |
econ. | most critical path | kritischster Weg |
comp., MS | multiple critical paths | mehrere kritische Wege (A series of tasks that must be completed on schedule for a project to finish on schedule. Identify and track multiple critical paths to be more effective in managing conditions that could affect your project's finish date) |
econ. | semi-critical path | halbkritischer Weg |