Subject | English | Swedish |
comp., MS | backward scheduling | bakåtplanering (A method for determining a production schedule by beginning with the date the order is required to be ready and working backward to the date work must begin in order to meet the required due date) |
transp., avia. | cabin crew scheduling | kabinbesättningsplanering |
IT | critical path scheduling | nätplanering |
comp., MS | Dynamic Fair-Share Scheduling | dynamisk fördelning (A method, used for scheduling threads, that dynamically scales quotas based on load instead of requiring the administrator to explicitly specify quotas. It also adds the flexibility of aggregating thread quotas based on sessions instead of just users) |
transp. | dynamic scheduling | anropsstyrd trafik |
comp., MS | effort-driven scheduling | insatsberoende schemaläggning (The default method of scheduling in Project; the duration of a task shortens or lengthens as resources are added or removed from a task, while the amount of effort necessary to complete a task remains unchanged) |
comp., MS | finite scheduling | begränsad planering (A scheduling method that assumes that limited capacity for labor and machines is available) |
transp., avia. | flight crew scheduling | flygbesättningsplanering |
comp., MS | forward scheduling | framåtplanering (A method for determining a production schedule by beginning with the production start date and working forward to determine the production completion date) |
transp. | IATA scheduling season | IATA-flygningsäsong |
comp., MS | intercompany master scheduling | koncernintern huvudplanering (The process for generating a timetable for two or more legal entities that are part the same organization) |
environ. | labour scheduling | arbetsplanering |
comp., MS | manual scheduling | manuell schemaläggning (A type of scheduling that gives the user control over start and finish dates of their tasks. Tasks do not automatically get moved by the scheduling engine. The user can enter blank dates, textual dates, or dates that do not follow dependencies, calendar, and other scheduling engine rules) |
comp., MS | master scheduling | huvudplanering (The process for generating a timetable for matching supply with demand) |
comp., MS | net change master scheduling | nettoändring huvudplanering (A master scheduling principle in which net requirements are calculated only for items that have had a change in demand since the last master schedule was calculated) |
gen. | officer scheduling the exercise | övningsansvarig |
gen. | official scheduling the exercise | övningsansvarig |
IT, dat.proc. | one-job scheduling | tidsplan för en aktivitet |
IT, dat.proc. | operations scheduling | operationsplanering |
IT, transp. | priority scheduling system | prioritetsplaneringssystem |
IT, mech.eng. | process scheduling | schemaläggning av process |
comp., MS | process scheduling | processplanering (The assignment of business intelligence tasks for users, roles, and PerformancePoint Planning Server) |
transp., mater.sc. | production scheduling | produktionsschemaläggning |
transp., mater.sc. | production scheduling | produktionsprogrammering |
transp., mater.sc. | production scheduling | produktionsplanläggning |
transp., avia. | schedules facilitator | tidtabellsanpassare |
interntl.trade. | Schedules of Specific Commitments | listor över särskilda åtaganden |
comp., MS | Scheduling Assistant | schemaläggningsassistenten (An Outlook and Outlook Web Access feature that automatically suggests the best meeting times for a given a group of attendees, allowing users to schedule people and resources quickly and efficiently) |
commun. | scheduling of the channel request transmission | planering av sändning av kanalbegäran |
transp. | scheduling period | tidtabellsperiod |
IT, dat.proc. | single-job scheduling | tidsplan för en aktivitet |
IT, dat.proc. | task scheduling | aktivitetsplanering |
comp., MS | user-controlled scheduling | användarstyrd schemaläggning (A feature that allows the user to specify manual or automatic scheduling on a per-task basis) |