DictionaryForumContacts

Terms containing Scheduling | all forms | exact matches only
SubjectEnglishJapanese
comp., MSbackward schedulingバックワード スケジューリング (A method for determining a production schedule by beginning with the date the order is required to be ready and working backward to the date work must begin in order to meet the required due date)
lawdate for scheduling conference進行協議期日
gen.detail scheduling小日程計画
comp., MSDynamic Fair-Share Schedulingダイナミック フェアシェア スケジューリング (A method, used for scheduling threads, that dynamically scales quotas based on load instead of requiring the administrator to explicitly specify quotas. It also adds the flexibility of aggregating thread quotas based on sessions instead of just users)
comp., MSeffort-driven scheduling残存作業時間を優先するスケジュール方法 (The default method of scheduling in Project; the duration of a task shortens or lengthens as resources are added or removed from a task, while the amount of effort necessary to complete a task remains unchanged)
gen.n event-schedulingイベントスケジューリング
comp., MSfinite scheduling有限スケジューリング (A scheduling method that assumes that limited capacity for labor and machines is available)
comp., MSforward schedulingフォワード スケジューリング (A method for determining a production schedule by beginning with the production start date and working forward to determine the production completion date)
comp., MSintercompany master scheduling会社間マスター スケジューリング (The process for generating a timetable for two or more legal entities that are part the same organization)
comp., MSmanual scheduling手動スケジュール (A type of scheduling that gives the user control over start and finish dates of their tasks. Tasks do not automatically get moved by the scheduling engine. The user can enter blank dates, textual dates, or dates that do not follow dependencies, calendar, and other scheduling engine rules)
comp., MSmaster schedulingマスター スケジューリング (The process for generating a timetable for matching supply with demand)
gen.master scheduling大日程計画
comp., MSnet change master scheduling差分変更マスター スケジューリング (A master scheduling principle in which net requirements are calculated only for items that have had a change in demand since the last master schedule was calculated)
gen.operation scheduling中日程計画
comp., MSprocess schedulingプロセス スケジュール (The assignment of business intelligence tasks for users, roles, and PerformancePoint Planning Server)
comp., MSrisk-driven schedulingリスク駆動型スケジュール設定 (A principle of good scheduling that prioritizes tasks based on the level of risk involved and prioritizes features based on their importance to key stakeholders)
comp., MSScheduling and Delivery Processorスケジュールおよび配信のプロセッサ (A component of the report server engine that handles scheduling and delivery. Works with SQL Agent)
comp., MSScheduling Assistantスケジュール アシスタント (An Outlook and Outlook Web Access feature that automatically suggests the best meeting times for a given a group of attendees, allowing users to schedule people and resources quickly and efficiently)
gen.scheduling functionスケジューリング機能
gen.n scheduling system for just-in-time productionかんばん
gen.n scheduling system for just-in-time productionカンバン
comp., MSuser-controlled schedulingユーザー指定のスケジュール (A feature that allows the user to specify manual or automatic scheduling on a per-task basis)

Get short URL