Terms containing sChedule | all forms | exact matches only
SubjectEnglishLatvian
comp., MSbudget schedulebudžeta grafiks (A schedule for the planned expenditure of allocated financial resources)
comp., MSClass Schedulenodarbību plāns (A view in which you can organize class materials into assignments and lessons)
comp., MSdelivery schedulepiegādes grafiks (A schedule for the planned delivery of products)
comp., MSfinite schedulingierobežota plānošana (A scheduling method that assumes that limited capacity for labor and machines is available)
environ.fixed schedule of chargesnoteikts maksājumu grafiks
comp., MSjob scheduledarbu grafiks (The optimal dates and times for performing jobs at a work center)
transp., avia.loading scheduleiekraušanas plāns
comp., MSmaster schedulingvispārējā plānošana (The process for generating a timetable for matching supply with demand)
comp., MSpersonal schedulepersonisku pasākumu grafiks (A schedule of activities that are not related to work)
comp., MSproduction scheduleražošanas grafiks (A schedule to produce a specific item and item quantity at a specific time and by specific human and operational resources)
comp., MSSchedule a Conference...Plānot konferenci... (An item on the Actions menu that opens a new Outlook meeting invitation using the user's conferencing information)
comp., MSSchedule a MeetingIeplānot sapulci (A menu item that opens an Outlook meeting invitation prepopulated with the selected contact(s))
comp., MSSchedule a MeetingIeplānot tikšanos (A menu item that opens an Outlook meeting invitation prepopulated with the selected contact(s))
polit.Schedule of meetings ServiceSanāksmju kalendāra dienests
gen.schedule of specific commitmentsspecifisko saistību grafiks
comp., MSschedule performance index The ratio of the earned value (EV), which is sometimes referred to as the budgeted cost of work performed (BCWP), to the planned value (PV), which is sometimes referred to as the budgeted cost of work scheduled (BCWS). SPI is often used to estimate the project completion date. The SPI value is calculated as follows: SPI = EV/PV. If the resulting SPI value is less than 1.0, that indicates that less work was completed on the project than was planned. If the SPI value is 1.0 or greater, that indicates that more work was completed than was planned; SPIgrafika izpildes indekss (SPI)
comp., MSschedule varianceizmaksu novirze (The difference between the budgeted cost of work performed [BCWP] and the budgeted cost of work scheduled [BCWS]. This is calculated as follows: SV = Budgeted Cost of Work Performed - Budgeted Cost of Work Scheduled)
comp., MSSchedule Viewgrafika skats (An Outlook Calendar view in which each calendar is listed vertically (not side-by-side). This view is optimized for viewing a schedule for a group and scheduling a meeting for a group)
interntl.trade.Schedules of Specific Commitmentsspecifisko saistību grafiki
gen.services schedulespecifisko saistību grafiks
comp., MSuser-controlled schedulinglietotāja pārvaldīta plānošana (A feature that allows the user to specify manual or automatic scheduling on a per-task basis)
comp., MSvesting scheduleizmaksas grafiks (The manner in which-long term variable compensation is distributed to an employee. Long-term incentives are awarded at one time but distributed at a later time)
econ.work scheduledarba grafiks