Subject | English | Latvian |
comp., MS | acquisition date | iegādes datums (The date that an asset is acquired) |
comp., MS | begin date | sākuma datums (The date when a project or task is scheduled to begin) |
comp., MS | best before date | derīguma termiņa datums (A recommended date for obtaining the optimum quality or characteristic of a product) |
insur. | closing date for submission of tenders | piedāvājumu iesniegšanas termiņš |
comp., MS | cycle end date | perioda beigu datums (The final date of the active period on which the variable compensation award is based) |
comp., MS | date literal | datuma literālis (Any sequence of characters with a valid format that is surrounded by number signs (). Valid formats include the date format specified by the locale settings for your code or the universal date format) |
comp., MS | date separator | datuma atdalītājs (A character that is used to separate the day, month, and year when date values are formatted. The characters are determined by system settings or by the Format function) |
comp., MS | Date/Time | Datums/laiks (A data type used to hold date and time information) |
comp., MS | early finish date | agrais beigu datums (The earliest date that a task could possibly finish, based on early finish dates of predecessor and successor tasks, other constraints, and any leveling delay) |
comp., MS | end date | beigu datums (The date on which a schedule or task ends) |
comp., MS | end date parameter | beigu datuma parametrs (A parameter to set an end date) |
comp., MS | finish date | beigu datums (The date that a project or task is scheduled to be completed. This date is based on the task's start date, duration, calendars, predecessor dates, task dependencies, and constraints) |
comp., MS | fixed date | fiksēts datums (A date to which a task is tied either because the date was entered in the Actual Start or Actual Finish field or because the task is constrained by an inflexible constraint) |
fin. | interest rate reset date | procentu likmes pārskatīšanas datums |
comp., MS | Last Modified Date/Time | pēdējais modifikācijas datums (The timestamp of the most recent modification of a Navision entity. The modified entries are retrieved from the Change Log. If the Last Modified Date/Time is older than the last synchronization time, then entities will not be synchronized. If The Last Modified Date/Time is more recent, the synchronization will be performed) |
comp., MS | late finish date | vēlais beigu datums (The latest date that a task can finish without delaying the finish of the project. It is based on the task's late start date, as well as the late start and late finish dates of predecessor and successor tasks, and other constraints) |
comp., MS | late start date | vēlais sākuma datums (The last possible date a task could be started if all predecessor and successor tasks also start and finish on their late start and late finish dates) |
comp., MS | physical date | fiziskais datums (The date a transaction physically occurred, such as the date that an item was received) |
comp., MS | Preparation of an Opening Balance Sheet at the Date of Transition to IFRS | sākuma bilances sagatavošana uz datumu, kad notiek pāreja uz SFPS (A template that addresses, from a Finance & Accounting perspective, the significant activities required of companies to prepare their opening balance sheet at the date of transition to IFRS within the context of a conversion from previous Generally Accepted Accounting Principles (GAAP) to International Financial Reporting Standards (IFRS)) |
comp., MS | program anniversary date | programmas gadadienas datums (The calendar date which marks the enrollment of a partner into the Microsoft Partner Program, including payment of any applicable membership fees) |
fin. | repayment date | atmaksas datums |
comp., MS | requested ship date | pieprasītais nosūtīšanas datums (The date that the selling party should ship items to meet the customer's or vendor's requested receipt date) |
comp., MS | status date | statusa datums (A date that you set [rather than the current date] for reporting the time, cost, or performance condition of a project) |
chem. | submission date | iesniegšanas datums |
comp., MS | term end date | termiņa beigu datums (The date at the end of a subscription. For example, in Microsoft Online Services, there are a variety of services that a customer may subscribe to, and each subscription has its own term length (e.g., 6 months, 12 months) and term end date) |