comp., MSbackward schedulingzpětné plánování (A method for determining a production schedule by beginning with the date the order is required to be ready and working backward to the date work must begin in order to meet the required due date)
comp., MSDynamic Fair-Share Scheduling A method, used for scheduling threads, that dynamically scales quotas based on load instead of requiring the administrator to explicitly specify quotas. It also adds the flexibility of aggregating thread quotas based on sessions instead of just usersPlánování dynamické distribuce (DFSS)
comp., MSeffort-driven schedulingplánování řízené úsilím (The default method of scheduling in Project; the duration of a task shortens or lengthens as resources are added or removed from a task, while the amount of effort necessary to complete a task remains unchanged)
comp., MSfinite schedulingomezené plánování (A scheduling method that assumes that limited capacity for labor and machines is available)
comp., MSforward schedulingdopředné plánování (A method for determining a production schedule by beginning with the production start date and working forward to determine the production completion date)
comp., MSintercompany master schedulingvnitropodnikové hlavní plánování (The process for generating a timetable for two or more legal entities that are part the same organization)
comp., MSmanual schedulingruční plánování (A type of scheduling that gives the user control over start and finish dates of their tasks. Tasks do not automatically get moved by the scheduling engine. The user can enter blank dates, textual dates, or dates that do not follow dependencies, calendar, and other scheduling engine rules)
comp., MSmaster schedulinghlavní plánování (The process for generating a timetable for matching supply with demand)
construct.material resource allocation schedulingplán materiálových potřeb
comp., MSnet change master schedulinghlavní plánování změn netto (A master scheduling principle in which net requirements are calculated only for items that have had a change in demand since the last master schedule was calculated)
comp., MSrisk-driven schedulingplánování na základě rizik (A principle of good scheduling that prioritizes tasks based on the level of risk involved and prioritizes features based on their importance to key stakeholders)
comp., MSScheduling and Delivery ProcessorPlánovací a doručovací procesor (A component of the report server engine that handles scheduling and delivery. Works with SQL Agent)
comp., MSScheduling AssistantPomocník pro plánování (An Outlook and Outlook Web Access feature that automatically suggests the best meeting times for a given a group of attendees, allowing users to schedule people and resources quickly and efficiently)
comp., MSuser-controlled schedulinguživatelem řízené plánování (A feature that allows the user to specify manual or automatic scheduling on a per-task basis)