DictionaryForumContacts

Terms containing date | all forms | exact matches only
SubjectEnglishCzech
comp., MSacquisition datedatum pořízení (The date that an asset is acquired)
comp., MSactive dateaktivní datum (The date at which something goes into effect or becomes applicable)
comp., MSanniversary datedatum výročí (The calendar date which signifies the date on which an event occurred in some previous year)
comp., MSapp proceeds to datevýnos z aplikace k dnešnímu dni (Receipts after the Windows Store fee has been subtracted)
gen.balance sheet daterozvahový den
comp., MSbegin datepočáteční datum (The date when a project or task is scheduled to begin)
comp., MSbest before datedatum doporučené spotřeby (A recommended date for obtaining the optimum quality or characteristic of a product)
commer., food.ind."best before" datedatum minimální trvanlivosti
fin.call datevypověditelná lhůta
fin.callable datevypověditelná lhůta
comp., MScheck datedatum šeku (The date on the check)
comp., MSclose datedatum uzavření (The date on which an opportunity is closed, either because it resulted in a sale or was unsuccessful)
construct.commencement datedatum zahájení prací na díle
comp., MSconfirmed receipt datepotvrzené datum příjmu (The date the selling company confirms that a customer or vendor will receive the goods)
comp., MSconfirmed ship datepotvrzené datum expedice (The date that the selling party confirms that the items will ship to a customer or vendor)
comp., MScycle end datekoncové datum cyklu (The final date of the active period on which the variable compensation award is based)
comp., MScycle start datepočáteční datum cyklu (The beginning date of the active period on which the variable compensation award is based)
comp., MSdate expressionvýraz typu datum (Any expression that can be interpreted as a date. This includes any combination of date literals, numbers that look like dates, strings that look like dates, and dates returned from functions)
astr.date linedatová čára
comp., MSdate literalliterál typu datum (Any sequence of characters with a valid format that is surrounded by number signs (). Valid formats include the date format specified by the locale settings for your code or the universal date format)
commer., food.ind.date of minimum durabilitydatum minimální trvanlivosti
commer., food.ind.date of minimum durability of a fooddatum minimální trvanlivosti
econ.date of putting into operationlhůta uvedení do provozu
agric.date palmpalma datlová
comp., MSdate period codekód datového období (A code that represents a period of time measured by starting and ending dates)
comp., MSdate pickerVýběr data (A control that developers use to allow a user to select a date)
comp., MSdate picker controlovládací prvek pro výběr data (A control that developers use to allow a user to select a date)
bot.date plumtomel
comp., MSdate rangerozsah dat (The time span between the start and end dates)
comp., MSdate separatoroddělovač data (A character that is used to separate the day, month, and year when date values are formatted. The characters are determined by system settings or by the Format function)
comp., MSDate/TimeDatum a čas (A data type used to hold date and time information)
comp., MSdeadline datedatum konečného termínu (A target date that indicates when you want a task to be completed and allows you to track the status of the task against that target without imposing a constraint on the schedule)
construct.delivery datedodací lhůta
construct.directive datepředepsaný termín
construct.directive datepředepsané trvání
construct.directive datepředepsaná lhůta
construct.directive date for event completionpředepsaný termín uzlu
comp., MSdisposal datedatum vyřazení (The date that an asset is sold or discarded)
comp., MSdue datetermín splnění (The date by which some task or action should be completed)
fin.due datedatum splatnosti
construct.earliest datenejdříve možný termín
comp., MSearly finish datedatum nejdříve možného dokončení (The earliest date that a task could possibly finish, based on early finish dates of predecessor and successor tasks, other constraints, and any leveling delay)
comp., MSeffective datepočáteční datum (The date at which something goes into effect or becomes applicable)
comp., MSend datekoncové datum (The date on which a schedule or task ends)
comp., MSend date parameterparametr koncového data (A parameter to set an end date)
construct.event completion datetermín uzlu
comp., MSexpiration datedatum vypršení platnosti (The date on which something ceases to be effective)
comp., MSexpiration datedatum ukončení platnosti (The date after which information or a resource is no longer valid)
health., pharma.expiry datedatum ukončení použitelnosti
comp., MSfinish datedatum dokončení (The date that a project or task is scheduled to be completed. This date is based on the task's start date, duration, calendars, predecessor dates, task dependencies, and constraints)
fin.first call dateprvní vypověditelná lhůta
fin.first callable dateprvní vypověditelná lhůta
comp., MSfixed datepevné datum (A date to which a task is tied either because the date was entered in the Actual Start or Actual Finish field or because the task is constrained by an inflexible constraint)
comp., MSfutures datedatum termínu (An order due date, generated by master scheduling, that is based on lead times for all levels of an item)
econ.indicative datepředběžné datum
fin.interest rate reset datedatum nastavení úrokových sazeb
pharma.international birth datemezinárodní datum narození
comp., MSitem expiration datedatum vypršení lhůty položky (The date after which an item is no longer usable)
comp., MSLast Modified Date/Timedatum a čas poslední změny (The timestamp of the most recent modification of a Navision entity. The modified entries are retrieved from the Change Log. If the Last Modified Date/Time is older than the last synchronization time, then entities will not be synchronized. If The Last Modified Date/Time is more recent, the synchronization will be performed)
comp., MSlate finish datedatum nejpozději možného dokončení (The latest date that a task can finish without delaying the finish of the project. It is based on the task's late start date, as well as the late start and late finish dates of predecessor and successor tasks, and other constraints)
comp., MSlate start datedatum nejpozději možného zahájení (The last possible date a task could be started if all predecessor and successor tasks also start and finish on their late start and late finish dates)
construct.latest datenejpozději přípustný termín
comp., MSlong datedlouhé datum (The standard long formats to display a date)
fin.maturity datedatum splatnosti
commer., food.ind.minimum durability datedatum minimální trvanlivosti
comp., MSmonthly reset datedatum obnovení měsíčního limitu (A setting where the user provides the date when their monthly data usage resets to 0)
comp., MSphysical datefyzické datum (The date a transaction physically occurred, such as the date that an item was received)
comp., MSplace in service datedatum uvedení do užívání (The date that an asset is ready and available for service)
comp., MSposting datedatum zaúčtování (The date that a transaction is recorded)
comp., MSPreparation of an Opening Balance Sheet at the Date of Transition to IFRSpříprava počáteční rozvahy k datu přechodu na standardy IFRS (A template that addresses, from a Finance & Accounting perspective, the significant activities required of companies to prepare their opening balance sheet at the date of transition to IFRS within the context of a conversion from previous Generally Accepted Accounting Principles (GAAP) to International Financial Reporting Standards (IFRS))
comp., MSprogram anniversary datedatum výročí členství v programu (The calendar date which marks the enrollment of a partner into the Microsoft Partner Program, including payment of any applicable membership fees)
comp., MSreceipt datedatum příjmu (The date transferred goods are received in a warehouse. Receipt date applies to transfer orders)
fin.redemption dateden splatnosti
comp., MSrelative daterelativní datum (A range of dates that is specified by using comparison operators and return data for a range of dates)
fin.repayment dateden splatnosti
fin.reporting reference datereferenční datum vykazování
comp., MSrequested receipt datepožadované datum příjmu (The date a customer or vendor requests that goods be received)
comp., MSrequested ship datepožadované datum expedice (The date that the selling party should ship items to meet the customer's or vendor's requested receipt date)
comp., MSretirement datedatum vyřazení (The date that an asset is sold or discarded)
comp., MSship datedatum expedice (The date that items are shipped from a shipping location)
comp., MSshort datekrátké datum (The standard short formats to display a date. For example: MM/dd/yy; dd/MM/yy)
comp., MSstart datepočáteční datum (The date when a project or task is scheduled to begin)
comp., MSstatus datedatum stavu (A date that you set [rather than the current date] for reporting the time, cost, or performance condition of a project)
chem.submission datedatum podání
law, chem.sunset datedatum zániku
comp., MSterm end datekoncové datum období (The date at the end of a subscription. For example, in Microsoft Online Services, there are a variety of services that a customer may subscribe to, and each subscription has its own term length (e.g., 6 months, 12 months) and term end date)
construct.unforeseeable means not reasonably foreseeable by an experienced contractor by the date for the submission of the tendernepředvídatelný znamená takový, jenž nemůže být důvodně předpokládán zkušeným zhotovitelem k datu podání nabídky
law, agric., food.ind."use by" datedatum použitelnosti
construct.valuation at date of terminationocenění k datu odstoupení

Get short URL