comp., MS | backward scheduling | planowanie wstecz (A method for determining a production schedule by beginning with the date the order is required to be ready and working backward to the date work must begin in order to meet the required due date) |
comp., MS | Dynamic Fair-Share Scheduling | harmonogram dynamicznego odpowiedniego udostępniania (A method, used for scheduling threads, that dynamically scales quotas based on load instead of requiring the administrator to explicitly specify quotas. It also adds the flexibility of aggregating thread quotas based on sessions instead of just users) |
comp., MS | effort-driven scheduling | planowanie według nakładu pracy (The default method of scheduling in Project; the duration of a task shortens or lengthens as resources are added or removed from a task, while the amount of effort necessary to complete a task remains unchanged) |
comp., MS | finite scheduling | ograniczone planowanie (A scheduling method that assumes that limited capacity for labor and machines is available) |
comp., MS | forward scheduling | planowanie wprzód (A method for determining a production schedule by beginning with the production start date and working forward to determine the production completion date) |
comp., MS | intercompany master scheduling | międzyfirmowe planowanie główne (The process for generating a timetable for two or more legal entities that are part the same organization) |
comp., MS | manual scheduling | ręczne planowanie (A type of scheduling that gives the user control over start and finish dates of their tasks. Tasks do not automatically get moved by the scheduling engine. The user can enter blank dates, textual dates, or dates that do not follow dependencies, calendar, and other scheduling engine rules) |
comp., MS | master scheduling | planowanie główne (The process for generating a timetable for matching supply with demand) |
construct. | material resource allocation scheduling | plan zapotrzebowania na środki materialne |
comp., MS | net change master scheduling | planowanie główne zmian netto (A master scheduling principle in which net requirements are calculated only for items that have had a change in demand since the last master schedule was calculated) |
comp., MS | process scheduling | planowanie procesu (The assignment of business intelligence tasks for users, roles, and PerformancePoint Planning Server) |
comp., MS | risk-driven scheduling | planowanie sterowane ryzykiem (A principle of good scheduling that prioritizes tasks based on the level of risk involved and prioritizes features based on their importance to key stakeholders) |
comp., MS | Scheduling and Delivery Processor | Procesor planowania i dostarczania (A component of the report server engine that handles scheduling and delivery. Works with SQL Agent) |
comp., MS | Scheduling Assistant | Asystent planowania (An Outlook and Outlook Web Access feature that automatically suggests the best meeting times for a given a group of attendees, allowing users to schedule people and resources quickly and efficiently) |
transp., avia. | scheduling period | sezon lotniczy |
transp. | scheduling season | sezon rozkładowy |
comp., MS | user-controlled scheduling | planowanie kontrolowane przez użytkownika (A feature that allows the user to specify manual or automatic scheduling on a per-task basis) |