DictionaryForumContacts

Terms containing scheduling | all forms | exact matches only
SubjectEnglishArabic
comp., MSbackward schedulingجدولة للخلف (A method for determining a production schedule by beginning with the date the order is required to be ready and working backward to the date work must begin in order to meet the required due date)
corp.gov.defensive schedulingجدولة على أساس الحد من النفقات
corp.gov.defensive schedulingجدولة وقائية
comp., MSeffort-driven schedulingجدولة حسب المجهود (The default method of scheduling in Project; the duration of a task shortens or lengthens as resources are added or removed from a task, while the amount of effort necessary to complete a task remains unchanged)
comp., MSfinite schedulingجدولة محدودة (A scheduling method that assumes that limited capacity for labor and machines is available)
comp., MSforward schedulingجدولة للأمام (A method for determining a production schedule by beginning with the production start date and working forward to determine the production completion date)
comp., MSintercompany master schedulingجدولة رئيسية مشتركة بين الشركات الشقيقة (The process for generating a timetable for two or more legal entities that are part the same organization)
water.res.irrigation schedulingالجدول الزمني للري
water.res.irrigation schedulingمواعيد الري
water.res.irrigation scheduling programmeمواعيد الري
comp., MSmanual schedulingجدولة يدوية (A type of scheduling that gives the user control over start and finish dates of their tasks. Tasks do not automatically get moved by the scheduling engine. The user can enter blank dates, textual dates, or dates that do not follow dependencies, calendar, and other scheduling engine rules)
comp., MSmaster schedulingجدولة رئيسية (The process for generating a timetable for matching supply with demand)
comp., MSnet change master schedulingصافي التغير في الجدولة الرئيسية (A master scheduling principle in which net requirements are calculated only for items that have had a change in demand since the last master schedule was calculated)
econ.production schedulingتحطيم الإنتاج
comp., MSrisk-driven schedulingجدول المخاطر (A principle of good scheduling that prioritizes tasks based on the level of risk involved and prioritizes features based on their importance to key stakeholders)
comp., MSScheduling Assistantمساعد الجدولة (An Outlook and Outlook Web Access feature that automatically suggests the best meeting times for a given a group of attendees, allowing users to schedule people and resources quickly and efficiently)
polit.scheduling of itemsرزنامة النّقط المدرجة في جدول الأعمال
comp., MSuser-controlled schedulingجدولة بواسطة المستخدم (A feature that allows the user to specify manual or automatic scheduling on a per-task basis)

Get short URL