Subject: Direct tip material Прошу помощи специалистов горной отрасли с в/у термином ... В интернете ничего внятного не нашлаThe Gruyere mine utilises mining contractors to mine the open pit using conventional drill, blast, load and haul activities. The Gruyere pit mined oxide and fresh rock material in 2023, allowing validation and optimisation of the geotechnical parameters. The pit is designed to be mined in stages over the LOM. Material was mined from stages two, three and four during 2023. The new LOM expands the pit from stages three to seven. During 2023, mining consisted of predominantly fresh rock material mined, which is harder and more abrasive than oxide material previously processed. Crusher feed to the processing plant is provided by a combination of direct tip material from the mine and rock sourced from the ROM and long-term stockpiles.
|