Subject: Input to enable Execution Взято из технического задания.Civils, Structural, Instrument & Control, Electrical, Piping and other discipline work sufficient to develop cost blocks for all items not covered by equipment list and bulks estimates; • MTOs to enable Cost estimate generation (-/+30%). Input to enable Execution • Plant capacity review • Control and operability review • Proposed modifications for selected option (equipment/piping/valves/safety devices) • Review of impact on existing control systems • Details of required instrumentation and control system modifications • Details of required electrical system modifications Что может значить "Input to enable Execution" ? Спасибо! |