 Пан

link 19.06.2014 7:56 
Subject: Cement rise behind casing O&G
The well was drilled to a target depth of 3900M TVD with production casing shoe at 3898 m. The previous casing shoe was at 1100M. Cement rise behind casing was planned at 800 m from surface. Thus a very long open hole section (3098m) was required to be cemented in one go. It was a directional well and the well profile was also corrected drastically during the drilling of the well.

спасибо

 mikhailS

link 19.06.2014 8:04 

 