Subject: Transition Support mil. что значит это понятие?контекст C2.2.2.3.1. In the event that a transition from initial contractor support to organic supply support is required, it should be planned as follows: C2.2.2.3.1.1. The transition schedule should be based on design stability and supply support concept compatibility with maintenance concepts and other logistics support elements. C2.2.2.3.1.2. Contractor to organic supply support transition and schedules should be consistent with the system/equipment logistics support plan. Phased support approaches are encouraged, allowing for the cost-effective transition to organic supply support. C2.2.2.3.2. In the event that a contractor |
Отфонарный вариант:) поддержка в переходный период |