Subject: panel, sub-panel - электр. Интересует как правильно первести panel и sub-panel в данном случае.Generator sets produce either single or three phase power. You should use the type of power your panel provides.Your service panel is either single phase or three phase, you don't need a three phase generator if your panel is only single phase. Go and look at your service panel and see what the amperage is. If the panel is 100 Amps that tells you that your won't need more then 100 amps of power. As the panel gets bigger so will your generator needs. It is possible to install a generator to power only a small portion of your service panel, if you install appropriate sub-panels to sort out what will and will not be powered. Спасибо |
sub-panels - зд. модификации или различные исполнения панели/щита, в которых отсутствуют ненужные вам компоненты |
попробуйте (электрический/распределительный) Щит и секция щита |