|
link 21.09.2006 10:20 |
Subject: Preparation of System / Subsystem status and turnover / handover of the system Preparation of System / Subsystem status and turnover / handover of the system to Client progressivelyчто-то я вообще смысла не понял |
You need to be logged in to post in the forum |