Subject: LOI в данном контексте gen. Приветствую, подскажите пожалуйста LOI в данном контексте - письмо/меморандум о намерениях?Sub-contractor to confirm that the total engineering schedule for the entire scope of work shall be a maximum of 8weeks from the date of LOI. Separate teams shall be assigned as agreed upon during detailed engineering phase. The schedule based on output priorities shall be strictly adhered. |
letter of intent |
You need to be logged in to post in the forum |