Subject: water on the wall gen. Уважаемые коллеги,Как это правильно перевести? Встречается в следующем контексте: • Roof calibration On the basis of material lists and construction drawings the roof mass can be determined The lowest level of the roof critical zone should be determined during the bottom calibration. If the determination of the lowest point of the roof critical zone did not take place during bottom calibration, the lowest point can be determined from drawings using the “water on the wall” data. Заранее спасибо!
|