Subject: The side booms stopped with the pipe hanging. Lowering in of pipe string at KM 415 is not performed at once. The side booms stopped with the pipe hanging. There were some joint coating defects to be repaired in front of the booms.thank you! |
Стрелы боковой подвески (у трубоукладчиков) были зафиксированы с трубой на весу, чтобы произвести ремонт изоляции на отдельных участках в районе подвески. |