Subject: помогите кто может O&G Since this test consists of conducting a sampling system certification where the profile of the line is mixed and then presented to a single sample take off point,the profile testing procedure of ISO3171, Point 6, has not to be taken into consideration.речь идеть о пробоотборе |
в чем вопрос-то? |
не могу слепить все предложение не понял сути |
нужно почитать пункт 6 ИЗО 3171 |
You need to be logged in to post in the forum |