|
link 19.06.2009 10:29 |
Subject: looping the ends by new overhead lines 9.3 Electrical9.3.2 General Concept 9.3.2.5 Tie-in The plant shall supply electrical net power of approximately 322 MW into the 400 kV electric power grid. Reactive power shall be according to grid requirement, later to be defined. The power plant step-up transformer shall be connected to a new 400 kV air insulated switchgear (AIS) next to the plant. This 400 kV switchgear shall be connected to the existing 400 kV transmission system by opening the "Banja Luka – Doboj" line and looping the ends by new overhead lines (OHL) with two feeders through the new switchgear. An additional feeder with 400/110 kV, 300 MVA transformer shall establish an OHL connection to the existing substation 110 kV SS Stanari. Equipment like OHL connections, line feeders and the feeder at SS Stanari, with exception of the new 400 kV generator/transformer bay, are not in this specifications scope and will be provided by others. 9.3 Электрическое оборудование |
|
link 19.06.2009 12:23 |
может так? посредством размыкания линии Баня Лука – Добой и замыкания концов новыми воздушными линиями (ВЛ) с двумя питающими линиями через новое распределительное устройство. |
Yep! |
You need to be logged in to post in the forum |