Subject: Подведение всех инженерных сетей до границ участка плиз help
|
|
link 21.08.2007 11:37 |
installation of all/the entire network of utility services/connections within the battery limits/plot boundaries/construction site boundaries, imho |
pasiboooo |
Если от городских сетей до границ участка, то: Provide all points of entries at site boundaries/property line (имхо) |
You need to be logged in to post in the forum |