![]() |
critical path | |
comp., MS | chemin critique |
construct. | chemin critique |
fin. | chemin critique |
analysis | |
commun. chem. | analyse |
construct. | calcul |
environ. | analyse |
life.sc. | diagnostic |
market. | ventilation |
met. | prêt pour l'analyse |
| |||
chemin critique (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project) | |||
chemin critique | |||
indispensables m | |||
| |||
chemin critique (méthode PERT) |
critical-path: 9 phrases in 6 subjects |
Aviation | 1 |
Economy | 3 |
Finances | 1 |
Information technology | 1 |
Microsoft | 2 |
Politics | 1 |