Italian | English |
interpolare con variazione in entrata | ease in (To modify how the property value changes as time approaches the keyframe. A value of 100% would make the property change slow down as time approached the keyframe) |
interpolare con variazione in uscita | ease out (To modify how the property value changes as time moves away from the keyframe. A value of 100% would make the property change start slowly as time left the keyframe) |
interpolazione con variazione in entrata | ease-in interpolation (A kind of animation interpolation that modifies how the property value changes as time approaches the keyframe. A value of 100% would make the property change slow down as time approached the keyframe) |
interpolazione con variazione in uscita | ease-out interpolation (A kind of animation interpolation that modifies how the property value changes as time moves away from the keyframe. A value of 100% would make the property change start slowly as time left the keyframe) |
variazione al completamento | variance at completion (The earned value field that shows the difference between the budget at completion [BAC] and the estimate at completion [EAC]. In Project, the EAC is the Total Cost field, and the BAC is the Baseline Cost field) |
variazione della programmazione | schedule variance (The difference between the budgeted cost of work performed [BCWP] and the budgeted cost of work scheduled [BCWS]. This is calculated as follows: SV = Budgeted Cost of Work Performed - Budgeted Cost of Work Scheduled) |