English | Romanian |
Class Schedule | Planificare cursuri (A view in which you can organize class materials into assignments and lessons) |
personal schedule | planificare personală (A schedule of activities that are not related to work) |
Schedule a Conference... | Planificare conferință (An item on the Actions menu that opens a new Outlook meeting invitation using the user's conferencing information) |
Schedule a Meeting | Planificare întâlnire (A menu item that opens an Outlook meeting invitation prepopulated with the selected contact(s)) |
schedule performance index The ratio of the earned value (EV), which is sometimes referred to as the budgeted cost of work performed (BCWP), to the planned value (PV), which is sometimes referred to as the budgeted cost of work scheduled (BCWS). SPI is often used to estimate the project completion date. The SPI value is calculated as follows: SPI = EV/PV. If the resulting SPI value is less than 1.0, that indicates that less work was completed on the project than was planned. If the SPI value is 1.0 or greater, that indicates that more work was completed than was planned; SPI | indicator de performanță a planificării (IPP) |
schedule variance | variație a previziunilor (The difference between the budgeted cost of work performed [BCWP] and the budgeted cost of work scheduled [BCWS]. This is calculated as follows: SV = Budgeted Cost of Work Performed - Budgeted Cost of Work Scheduled) |
Schedule View | Vizualizare planificare (An Outlook Calendar view in which each calendar is listed vertically (not side-by-side). This view is optimized for viewing a schedule for a group and scheduling a meeting for a group) |
sync schedule | programare sincronizare (The times that will trigger automatic synchronization between a device and Exchange Server every time an item arrives or is modified in Exchange Server) |
user-controlled scheduling | programare controlată de utilizator (A feature that allows the user to specify manual or automatic scheduling on a per-task basis) |